How we work
A clear, remote-first process designed for clients abroad.
- 01
Send your project
The mechanical project is best. If there is none, tell us what you need (HVAC, plumbing, fire lines) and send the architectural plan. Photos and the floor area are also a good start.
- 02
Remote quotation
We prepare the offer from the documents. A restaurant branch takes 3–4 days; a 15-storey building can take up to a month. A site survey is possible if you want one; it is charged separately.
- 03
Video meeting
Once the project is serious, we go through the scope, schedule and equipment together in a video call.
- 04
Agreement and payment terms
Installation starts with an advance payment (mobilisation and initial materials), followed by progress payments. For projects abroad we work with a letter of credit. Equipment-only sales are EXW Turkey.
- 05
Installation
Our core crew travels from Turkey and works with local assistants. Visas, permits and local labour obligations are handled on the client's side.
- 06
Commissioning and maintenance
We commission and hand over the system, then offer periodic maintenance, typically two visits a year.